Category / ARCHICAD / News
-
Solibri wins ‘BIM Project of the Year’ in the 2019 Construction Computing Awards
The 2019 Construction Computing Awards chose Solibri and Evolve Consultancy as this year’s ‘BIM Project of the Year’. Thank you Nigel Davies and the Tideway team for understanding the value Solibri could…
-
BIM practitioners vote ARCHICAD ‘BIM Product of the Year’ Ninth Year in a Row
BUDAPEST, November 21, 2019 – GRAPHISOFT, the leading Building Information Modeling (BIM) software developer for architects, has announced that ARCHICAD 23 has won the prestigious BIM Product of the Year award at…
-
What’s new in Lumion 10 ?
Breathe life into 3D models. Invite others to see the beauty of your designs. Lumion 10 builds on the tradition of making 3D rendering a stress-free part of architectural workflows. Simply…
-
All together
All Together In business, the result of technological change is often measured in financial terms alone. Things like higher profits. Lower costs. Greater efficiency. Fewer project hours. Adopting BIM enables them all.…
-
GreenDS – Ký kết thỏa thuận hợp tác MOU cùng ĐH Bách Khoa TP Hồ Chí Minh
Sáng ngày 8/11/2019, ĐH Bách Khoa TP Hồ Chí Minh tổ chức lễ trao bằng tốt nghiệp cho các tân kỹ sư, tân thạc sĩ, tiến sĩ. Cùng trong buổi lễ, công…
-
Case Study ARCHICAD: CLV House in Wallis
Article source: Alp’Architecture Sàrl The project is tightly bound to the few liberties left by the plot on which it is located. The north exposition and the numerous constructions in the surrounding…
-
ARCHICAD Case study: Dual Modern House
HOUSES · KENSINGTON, UNITED STATES Architect: KUBE architecture Area: 1200.0 ft2 Project year: 2019 Photographer: Anice Hoachlander, Julia Heine Manufactures: Flos, Graphisoft, Lacava, Stone Source, Mosaic Tile, Adobe, Design Within Reach, Trimble Text description provided by the architects. This renovation…
-
Case study ARCHICAD – BD House
“BIM technology for Modular Prefab Housing Projects” Company name: Vilalta Architects Project Name: BD House Project Location: La Garriga, Spain Project Type, size: Residential, 200 m2 | 2,153 square feet Project cost: €240.000 | US$273,000 Year of…
-
ARCHICAD 23 – Operation BIM into practice
ARCHICAD 23 – Operation BIM into practice The special event about ARCHICAD in 2019 is coming soon! ARCHICAD 23 – Operation BIM into practice – The event is exclusively for construction architects,…
-
ARCHICAD implementation at the right moment: Goiás Arena
A Case Study about ARCHICAD implementation at the right moment: Recognizing the need for agility and speed in the development of a large and challenging project, Goiás Arena, with a delivery time…
Recent Posts
- GreenDS offers the opportunity to study Archicad for students at Vietnamese-German University
- ZWCAD – Efficient 2D CAD software
- Finding the Middle Ground- Improve MEP Coordination with Solibri
- LWK + Partners, Hong Kong – Archicad Case Study
- Designing for Safety: Introducing Solibri Inside’s Vertical Clearance Rule Type